Portfolio

renovation / upfit

Featured Project

LendingTree Corporate Headquarters – Charlotte, NC

LendingTree’s new corporate headquarters are located one of the two towers at Vantage South End. As the general contractor, Shelco completed the 165,000 SF multi-floor and multi-functional upfit over six floors. The high-end Class “A” office space includes 300 different finish selections and custom wood ceilings. Over the six floors there are 771 works stations, 64 conference rooms and 27 open meeting/collaborative spaces as well as a recording and Yoga studio. The architect, Redline Design Group was awarded Design Works Best in Show and Winner Corporate Large for their unique open-concept design by IIDA Carolinas Chapter for the project!

About Renovation/Upfit

We have transformed existing spaces into modern, efficient workspaces for several unique uses including office, industrial, healthcare, high-tech, educational, student housing and retail. Our experience will help you navigate the design, permitting, scheduling and construction challenges these projects face.

Completed Projects

ICON Raleigh Training Center

Design-Build Tenant Upfit – Raleigh, NC (5,000 SF)

  • Removed existing operable wall to separate one large conference room into two conference rooms
  • Finish upgrades through with paint, VWC and carpet
  • All work completed in an occupied suite

Truist Tower | Plaza Courtyard

Plaza Renovation at Truist Tower Uptown – Charlotte, NC (20,000 SF)

  • Largest format pavers installed in Charlotte.
  • Required meticulous planning and coordination due to its location
  • AV power sources and Catenary lighting nestled within the design to bring sound and vision to any event

TTX Headquarters

Corporate Headquarters Office Relocation Across Several Floors – Charlotte, NC (60,000 SF)

  • Monumental stair addition
  • Exposed ceilings, fabric wall panels and Infininium Wall System
  • Polished/stained concrete floors

Japan Tobacco International

Tenant Improvements on Seventh Floor of One North Tower – Raleigh, NC (12,000 SF)

  • Custom millwork and Arktura pendants
  • Doors, frames, and hardware from the suite reclaimed
  • New medium pressure duct loop for entire floor

Hanesbrands Corporate Office Relocation

Corporate Office Upfit Across Four Floors – Winston-Salem, NC (110,000 SF)

  • Fortune 500 Client
  • Delivered all four floors in an impressive 95 days
  • Open-concept workspaces, private focus rooms, phone booth, floor-to-ceiling windows, and state-of-the-art video conferencing technology

Greater Winston-Salem, Inc.

Convert Previous Manufacturing Space to Office Space in Baily Park – Winston-Salem, NC (9,900 SF)

  • Open industrial design concept
  • New common area for collaboration
  • Architectural sound clouds throughout the space

Brightspeed Corporate Headquarters Upfit

Upfit in East Tower of Vantage South End at 1120 South Tryon St – Charlotte, NC (27,600 SF)

  • Class A upfit in LEED Silver office building
  • High-end millwork
  • Modern office design

HNTB Tenant Upfit at One North Hills

Tenant Improvements on Fifth Floor of Occupied Office Building – Raleigh, NC (25,000 SF)

  • Open seating workstations and glass-front offices
  • Multiple conference rooms, training room with galley prep area, and executive conference room
  • Approximately 120 workers occupied the space at one time during construction

VACO

Tenant Improvements on Third Floor of GlenLake VI Office Building – Raliegh, NC (15,000 SF)

  • 18 glass demountable partitions and architectural arches in the corridor
  • Doors, frames, and hardware from the suite reclaimed
  • Nominated by Triangle CREW for “Best Interiors Project Under 40,000 SF

United Bank Morrocroft Upfit

Two-story Office Shell and Upfit – Charlotte, NC (17,750 SF)

  • Exterior balcony with permeable paver system
  • Monumental stair and atrium overlook
  • Retail banking and corporate office area with boardroom overlooking South Park

Truist Innovation and Technology Center (ITC)

Technology Center UpfitCharlotte, NC (81,669 SF)

  • Open workspace with meeting rooms, focus rooms and break rooms
  • Monumental stairs
  • CoreNet 2022 Most Innovative Project of the Year Award Winner

Lowe's Tech Hub

Technology Headquarters Office Upfit Charlotte, NC (350,000 SF)

  • 15-story office upfit in Lowe’s Global Technology Center
  • Two-story auditorium with specialty finishes
  • Large training room/presentation center with operable partition

UNC Chapel Hill Kenan-Flagler Business School Upfit

Executive Education Facility on Fourth Floor of Legacy Tower I – Charlotte, NC (16,000 SF)

  • Classrooms equipped with state-of-the-art AV integrated systems for seamless video conferencing and presentations
  • Open office concept with eight workstations
  • Sound-absorbing baffle ceiling, K13 acoustical spray, and sound masking system

5815 Westpark Drive

LEED Certified Exterior and Interior Renovation of Existing Office Building Charlotte, NC (68,200 SF)

  • EIFS exterior walls with glazed storefronts and ACM panel blade walls with accent trim
  • Ornamental grand entry stair with polished concrete treads and landings with a steel sculpture from steel reclaimed from the demo portion of the project
  • Operable lobby windows tied to the BMS system for additional fresh air during economizer cycles

Junction at Five Points

Interior Demolition and Renovation of Existing WarehouseRaleigh, NC (45,000 SF)

  • Includes office, retail, and leasable storage space
  • Exterior makeover includes storefront glass and skylights

11000 Weston Parkway

Interior Upfit of Existing Office Building Cary, NC (19,000 SF)

  • Complete main lobby renovation
  • Removal of four-story monumental stair with concrete infills at each floor
  • Amenities areas including fitness center, locker rooms and restrooms

Xerox

Interior Upfit Cary, NC (100,000 SF)

  • New 2,500amp emergency power switch gear service
  • Power Over Ethernet lighting
  • 64 TV displays and integrated audio-visual systems

Parsons Executive Office Upfit

Upfit Spanning Two Floors Charlotte, NC (40,000 SF)

  • Monumental stairs with perforated steel plates with wood treads and landing
  • Separate video and audio recording studios
  • Two SCIF areas constructed per the National Counterintelligence and Security Center document ICD/ICS 705

BB&T/Truist Upfits at Corporate Center I & II

Class “A” Office Renovation Over Six FloorsCharlotte, NC (129,000 SF)

  • Creation of a whole building employee lounge and fitness center
  • Addition of one 2,400 kW generator to an existing building
  • Update all existing comfort cooling controls systems

NN Inc. Upfit | Waverly HUB Building

Office Upfit in Existing BuildingCharlotte, NC (80,000 SF)

  • Full gymnasium with yoga and cycling room with locker rooms
  • 65 offices with 22 traditional conference rooms
  • 2,700 SF auditorium with operable partitions

SunTrust | Midtown Plaza

Office Upfit on 10th floor Midtown Plaza Office Tower – Raleigh, NC (25,800 SF)

  • Exposed ceiling hallways
  • Full height wall tile and wood paneling in the lobby
  • Glass office fronts

PCAOB

Office Upfit in LEED Gold Existing Building Charlotte, NC (7,234 SF)

  • Conference room with operable partition
  • Unique angular layout and design
  • Custom millwork at break and copy rooms